Case studies

14 MWh deployed.
220 stories.

Five representative installs across factories, hospitals, EV hubs and microgrids.

Manufacturing · Peak shaving

Automotive parts factory · 480 kW BESS

OX-480K-3P + 320 kWp solar

A tier-2 automotive supplier was paying 22% of its electricity bill in demand charges alone. We sized a 480 kW / 960 kWh BESS to clip peak-hour demand and shift midday solar into evening shifts.

Demand cut
−38%
Payback
3.6yr
Solar self-use
94%
+
Hospital · Backup + UPS replacement

200-bed hospital · 240 kW BESS

OX-240K-3P + diesel hybrid

Replaced an ageing flooded-lead-acid UPS plus oversized DG set with a 240 kW BESS islanded in <20 ms. Critical care, imaging, server room and OT now ride through grid sags without DG starts.

DG runtime
−72%
Transfer
14ms
Uptime
99.99%
240 240 240
EV charging · Buffered DCFC

Expressway charging hub · 1.92 MW container

OX-1920K-3P

Three 240 kW CCS2 chargers on a 200 kW utility connection. The BESS absorbs the bursts, charges from a 480 kWp canopy and a small grid trickle.

Bays
3× 240 kW
Grid pull
200kW
PV
480kWp
Microgrid · Remote site

Telecom tower microgrid · 60 kW BESS

OX-60K-3P + 80 kWp PV

Off-grid telecom tower with poor grid access. A 60 kW BESS + 80 kWp PV runs the site fully solar-powered for nine months a year — DG only fires up during peak winter.

Solar fraction
86%
DG fuel cut
−82%
Altitude
3,800m
Residential · Solar hybrid

Villa community · 9 kW per home

18× OX-9K-3P

A gated community with 18 villas. Each home gets a 9 kW three-phase Orixe inverter + 12 kWp solar. EMS aggregates the fleet for community-level analytics.

Homes
18
Grid bill cut
−74%
Total kWp
216

Got a similar site in mind?

Tell us the load profile and constraints — we'll send a sizing proposal.

Request sizing